**Hanjiang District Shantou City People's Hospital New Hospital Building Supporting Project Design and Construction General Contracting**
**Notice No. Public Capital No. 48 [2017], Project No. HGJJ2017033**
**Project Name:** Design and Construction of the New Building for Hanjiang District Shantou City People’s Hospital
**Approved Document No.:** [2016]46
**Tenderer:** Shantou Hanjiang District Haoxing Construction Co., Ltd.
**Project Overview:**
The new hospital building project in Hanjiang District, Shantou City, has been approved under Regulation No. 46 [2016] issued by Handan Regulations. The project is located within the premises of Hanjiang District People’s Hospital. It includes an interior decoration area of 4,302.2 square meters, covering special-purpose rooms, interior finishes, and supporting facilities and equipment. Additionally, the project involves outdoor works such as a 4,620-square-meter road, 8,405-square-meter green landscape, and other ancillary works like signage systems.
The total investment for the project is 29.5 million yuan, with a construction cost of 25.68 million yuan. This includes construction engineering fees of 3.7 million yuan, installation project costs of 6.33 million yuan, decoration projects of 5.85 million yuan, and equipment costs of 9.8 million yuan (including 3.8 million yuan for basic operating room and delivery room equipment). Additional costs include design fees of 510,000 yuan, supervision fees of 390,000 yuan, a reserve fund of 1.13 million yuan, and other expenses totaling 1.61 million yuan.
**Funding Sources:**
- **Others:** Fiscal funds
**Scope of Bidding:**
This project covers the design and construction of the supporting infrastructure for the new hospital building. It includes, but is not limited to, planning, preliminary design, budget estimation, construction plan design, drawing changes, construction throughout the entire process, and related cooperation services such as reviewing as-built drawings. On the construction side, it encompasses all work based on approved construction drawings and documents provided by the contractor, including material procurement, construction timeline, quality control, safety production, civilized construction, acceptance, and project settlement.
**Preparation Status:**
- All preparatory work has been completed.
**Bidder Requirements:**
1. **Qualification Requirements:**
- The bidder must have independent legal person status and at least a Grade III construction qualification or higher, along with an effective "Safety Production License."
- The company must be registered in the "Integrated Evaluation System for Construction Enterprises in Shantou City."
- Possession of either an Engineering Design Integrated Class A Qualification or a Construction Engineering Industry Class B Qualification (or above), or a Construction Engineering Industry Professional Class B Qualification (or above).
- The tender accepts consortium bids, with no more than two units in the consortium. The lead unit must have construction qualifications.
2. **Project Manager Requirements:**
- The proposed project manager (construction supervisor) must hold a Grade II Registered Construction Engineer certificate (including temporary qualifications) and an effective safety production assessment certificate.
- For external bidders from Guangdong Province, the construction supervisor must be a Grade I Registered Construction Engineer (with valid temporary qualifications) and possess an effective Class B safety production assessment certificate.
- The design project leader must hold a Class I Registered Architect certificate.
3. **Compliance and Registration:**
- According to the notice from the Guangdong Provincial Department of Housing and Urban-Rural Development Offices (Guangdong City [2015] No. 52), information about foreign companies and their relevant personnel (project manager and design leader) must be entered into the “Enterprise and Personnel Integrity Information Registration Platform†in Guangdong and pass the data specification check.
- Bidders must also provide a “Notification Letter for Inquiring about Bribery Criminal Files Results†issued by the procuratorial office where the enterprise is registered, covering the company, its legal representative, the proposed construction manager, and the design leader. The inquiry period should cover nearly three years from the announcement date.
**Evaluation Method:**
- A comprehensive evaluation method will be used.
**Bidding Documents:**
- Bidding documents can be downloaded from the “Shantou Building Information Network†(http://). There are no bidding meetings, Q&A sessions, or site visits required for this project. Any questions from bidders must be submitted anonymously on the same website. Replies will be posted online.
**Submission of Bidding Documents:**
- The proposed project manager must bring original ID cards, original legal representative certificates, original authorization letters, architect certificates, and safety training assessments. A copy of the certificate (Type B) with an official seal must also be attached. Two copies of the “Bidder’s Submission of Bidding Document and Original Return of Certificate Materials†must be submitted on time. Otherwise, the bid will be rejected.
**Venue:**
- Shantou Public Resource Trading Center Lijiang Branch
**Information Release Date:**
- December 13, 2017
**Schedule:**
- Deadline for submitting questions: December 20, 2017, 17:00
- Tender closing time: December 21, 2017, 17:00
- Announcement of answers: December 22, 2017, 17:00
- Expert pickup time: January 9, 2018, 09:00
- Submission of tender: January 10, 2018, 09:00 – 10:30
- Bid evaluation and opening: January 10, 2018, 10:30
Speaker
Speakers are one of the most common output devices used with computer systems. Some speakers are designed to work
specifically with computers, while others can be hooked up to any type
of sound system. Regardless of their design, the purpose of speakers is
to produce audio output that can be heard by the listener.
Speakers are transducers that convert electromagnetic waves into sound waves. The speakers receive audio input from a device such as a computer or an audio receiver. This input may be either in analog or digital form. Analog speakers simply amplify the analog electromagnetic waves
into sound waves. Since sound waves are produced in analog form,
digital speakers must first convert the digital input to an analog
signal, then generate the sound waves.
The sound produced by speakers is defined by frequency and amplitude.
The frequency determines how high or low the pitch of the sound is. For
example, a soprano singer's voice produces high frequency sound waves,
while a bass guitar or kick drum generates sounds in the low frequency
range. A speaker system's ability to accurately reproduce sound
frequencies is a good indicator of how clear the audio will be. Many
speakers include multiple speaker cones for different frequency ranges,
which helps produce more accurate sounds for each range. Two-way
speakers typically have a tweeter and a mid-range speaker, while
three-way speakers have a tweeter, mid-range speaker, and subwoofer.
Speaker System,Magnet Speaker Acoustic,Moving Coil Loudspeaker,Metal Frame Mylar Speaker
Jiangsu Huawha Electronices Co.,Ltd , https://www.hnbuzzer.com