Heyuan Power Supply Bureau 2017 annual production project cost review tender notice

The bidding project of the Heyuan Power Supply Bureau in 2017 has been approved by Guangdong Power Grid Co., Ltd. with the approval of Radio and TV Department (2016) No. 299. The project construction unit is the Heyuan Power Supply Bureau of Guangdong Power Grid Co., Ltd. The construction fund is self-owned funds. As for bank loans, the source of the tender is the Heyuan Power Supply Bureau of Guangdong Power Grid Co., Ltd. The project has already met the conditions for tendering, and the service for this project is now subject to public bidding after being qualified.

2. Project overview and scope of tender
2.1 Construction Site: Heyuan City
2.2 Scale of the project: Heyuan Power Supply Bureau's 2017 annual production project cost audits mainly include: City Bureau, Yuancheng Bureau, Dongyuan Bureau, Peace Bureau, Lianping Bureau, Longchuan Bureau, Zijin Bureau, the project price audit service. For details, see the bidding documents.
Term of service: From the signing date of the contract to December 31, 2017, the specific duration of the contract shall prevail.
2.4 Bidding scope: Including, but not limited to, full-process cost control; separate commissioned construction drawing budget review; project settlement review; separate commissioned general project settlement report preparation (The specific project and service contents shall be subject to the power of attorney issued by the tenderer. For details, please refer to the bidding documents.
2.5 Division of tenders: This tender is divided into 3 bid segments (in principle, each bid unit can only have one bid segment at most). (For details on the division of tenders, see the tender documents). The bid item names and bidding contents are:
2.5.1 Heyuan Power Supply Bureau 2017 annual production project cost review (Bonus: City Bureau): Including Heyuan Power Supply Bureau's annual city bureau, peace bureau, Lianping Bureau, Longchuan Bureau, and Zijin Bureau's provincial investment project cost audit.
2.5.2 Heyuan Power Supply Bureau 2017 annual production project cost review (Bonus: Yuancheng Bureau, Dongyuan Bureau): Including the annual source city bureau of Heyuan Power Supply Bureau and the audit of provincial investment project of Dongyuan Bureau.
2.5.3 Heyuan Power Supply Bureau 2017 annual production project cost review (Bid Section: Peace Bureau, Lianping Bureau, Longchuan Bureau, Zijin Bureau): Including Heyuan Power Supply Bureau Annual Peace Bureau, Lianping Bureau, Longchuan Bureau, Zijin Bureau Subsidiary Raise the production project cost audit.
3. Bidder qualification requirements
3.1 It has an independent legal personality and holds a valid legal business license.
3.2 Qualification requirements: Qualification level B and above qualifications for engineering cost consulting companies.
3.3 Requirements of Cost Engineers: It is proposed that the person in charge of the project has obtained the practicing certificate for the Registered Cost Engineer and registered in the bid application unit.
3.4 Credit Requirement: There is no violation of the law. The government where the project is located, and China Southern Power Grid Co., Ltd. and Guangdong Power Grid Co., Ltd. have no qualification for restricted bidding.
3.5 Do not accept Consortium bids.
3.6 Others: IC cards have been processed at the Guangzhou Public Resource Trading Center.
Acquisition of tender documents
4.1 All interested bidders are invited to participate in the bid from February 15, 2017 to February 21, 2017, from 9:30 a.m. to 11:00 a.m. and from 14:00 a.m. to 16:00 p.m. (Beijing time).

Heat Pipe Solar Water Heating System

The selective coating on the inner cover of the Vacuum Tubes converts solar energy and transfers heat to the heat pipes by aluminum fins. The liquid in the heat pipe changes into vapor which rises to the condenser. Then the heat passes through the heat exchanger, the water inside of water tank is being heated, and the vapor becomes liquid, returning to the bottom of the heat pipe. This transference of heat creates a continuous circulation as long as the heat pipe vacuum tube collector is heated by sun.

Heat is transferred by liquid to the water tank and heat the water efficiently. In addition, heat pipe vacuum tubes is highly freezing resistance, which ensures higher efficiency in cold areas.

Pressurized water tank ensures high comfort when customer uses hot water, the water flow and water pressure is much higher than compact non-pressurized solar water heater.

Thermosiphon Heatpipe

Solar Hot Water System,Solar Tube Hot Water System,Heat Pipe Solar Water System,Heat Pipe Solar Water Heating System

Linuo Ritter International Co.,Ltd , https://www.lnrtsolarenergy.com